"A new generation of parking garage is open in the heart of Center City Philadelphia. The 220-car automated parking facility is called The Lift. It's convenient. It's attractively priced. It's safe. It's eco-friendly. "

- Developer: Brandywine Realty Trust 

Project Details

  • Opened in 2010
  • Building sole use as transient public parking
  • 59’ by 100’ site two blocks from Philadelphia City Hall in a dense highly trafficked city neighborhood
  • Three entry bays, three exit bays, no turntables required
  • Total capacity of 228 vehicles
  • Separate levels for passenger car and SUV parking
  • Storage and retrieval time of approximately one to two minutes (as fast or faster than a conventional garage)
  • Italian design, with some manufacturing of components by Atlas Technologies (Easy Park’s Factory)
  • Installed by Atlas Technologies
 Before and After Construction

 

Before and After Construction

 Garage facade

 

Garage facade

 Glass wall inside hoistway 

 

Glass wall inside hoistway